Westfield Churmside

Project: Westfield – Chermside Queensland

Builder: Scentre Group

Project Status: Expected completion March 2017

Westfield Construction division Scentre Group chose KwikSeal Systems for the major extension works at North Lakes QLD for the waterproofing of all areas requiring waterproofing.

The Areas of application of the KwikSeal Systems used on the North Lakes extension included:

Temporary Waterproofing during construction over existing operating retail.

 System Applied: 

  •  KwikSeal P45 Polybond primers
  •  KwikSeal PU70A UVR THIX

Total area covered: 3,000 Lineal Mtrs

Plantrooms:

  •  Systems Applied to External Perimeters over retail
  •  KwikSeal P45 Polybond primers
  •  KwikSeal PU70A UVR THIX
  •  KwikSeal WBE Epoxy in Grey Incorporating Anti-Slip

Total area covered: 1,500 Lineal Mtrs Plus 650 M2 floors

Planters:

  •  Systems Applied.
  •  KwikSeal P45 Polybond primers
  •  KwikSeal PU70A UVR THIX

Total area covered: 700 M2

Roof areas over Retail outside Childcare Centre

 Systems Applied:

  •  KwikSeal P45 Polybond primers
  •  KwikSeal PU70A UVR THIX
  •  KwikSeal KwikGrip Anti-slip.

Total area covered: 2,700 M2

Temporary Waterproofing 7 months into construction KwikSeal P70 UVR

Temporary Waterproofing 7 months into construction KwikSeal P70 UVR

Temporary Waterproofing 7 months into construction KwikSeal P70 UVR

Temporary Waterproofing 7 months into construction KwikSeal P70 UVR